Ta strona używa plików cookies.
Polityka Cookies    Jak wyłączyć cookies?    Bezpieczeństwo w sieci AKCEPTUJĘ

 

 

 

 

Wirtualna Ruda

 

 

start

historia

zabytki

szlaki

wirtualne spacery

 kontakt


 

previous

"Orzegów" coking plant technology

part 6

next

 

The technology path

 

 

In years 1952-1953, the battery no. 1 was refurbished and the process of pushing, crushing, quenching , and sorting the coke was mechanised. An inclined wharf surface was used thanks to which the coke broke down into smaller fragments under its own weight. Then it was segregated using circular sifter and two-sieve swing sifter and was directed to the tanks using conveyor belts. The sorting plant had a processing capacity of 40 tonnes of coke per hour. The coke was loaded from 6 tanks with capacity of 40 m3 to wagons.

 

 

 

 

Quenching coke on inclined ramp (from the collection of JSW KOKS Zabrze)

 

 

   

 

Pushing out coke to the inclined wharf

(from the collection of JSW KOKS Zabrze)

 

 

New coke sorting plant – loading conveyor on the ramp

(from the collection of JSW KOKS Zabrze)

 

   

 

 

previous

next

 

 


Projekty dofinansowane ze środków zewnętrznych